Compression Phase-2 Project
Client : International Oil & Gas CompanyCapacity : 90 – 160 MMSCFDPeriod : July 2015 – August 2016Location : South Sumatra Compression Phase-2 Project is mainly a restaging of 3 compressor units currently installed.
Client : International Oil & Gas CompanyCapacity : 90 – 160 MMSCFDPeriod : July 2015 – August 2016Location : South Sumatra Compression Phase-2 Project is mainly a restaging of 3 compressor units currently installed.
Client : PT. Pertamina EPCapacity : 75 MMSCFDPeriod : June 2011 – October 2014Location : Cepu, Central Java EPC of Central Processing Plant facility which consist of : 8 flow lines, Gas Separation Unit, Condensate Handling Unit, CO2, H2S & RSH Removal Unit, Molecular Sieve unit, Biological Sulfur Recovery Unit, Caustic…
Client : ConocoPhillips (Grissik) LtdCapacity : 25 MMSCFD & 45 MMSCFDPeriod : January 2012 – October 2013Location : Grissik, Letang – South Sumatra IKPT has been completed to build Rawa Modification Project (Brown Field Project) location in Southern Sumatra. This Project is conversion from Oil Plant to be Gas Plant with capacity is 25 MMScfd. In addition, some wells…
Client : PT. Medco Lematang E&PCapacity : 85 MMSCFDPeriod : January 2008 – January 2011Location : Lematang, South Sumatra Engineering, procurement, installation, and commissioning of Production facilities which includes the following facilities: Flow lines for five Singa wells Gas processing plant, including CO2 Removal unit and sulfur recovery include stand alone…
Client : Amerada Hess (Indonesia-Pangkah) Ltd.Capacity : 50 MMSCFDPeriod : March 2005 – March 2007Location : Ujung Pangkah, Gresik Detail engineering for the Ujung Pangkah Onshore Processing Facility including all engineering, procurement, fabrication and installation of the new gas processing plant and the Sales Gas Pipeline, Covering following item:Gas Treating Unit, Dehydration…
Client : PT. PERTAMINA (Persero)Capacity : 85 MMSCFDPeriod : July 2004 – June 2006Location : Merbau, Pagardewa – South Sumatra Merbau Gas Gathering Station, rate 85 MMSCFD, pressure 650 psigFlowline 4” Dia. from 14 locations of wellpad/wellheadGas Transmission Pipeline Merbau – Pagardewa 14” Dia. X 23 KMCondensate Pipeline 4” Dia. X 23 KMDehydration unit, CO2…
Client : Petrochina International Jabung Ltd.Capacity : 100 MMSCFDPeriod : May 2003 – August 2005Location : Jabung, Jambi – Sumatera Detail Engineering, Procurement and Construction for the Betara Gas Plant, Gas Recovery Facilities, InfrastructureBetara Gas Plant: Amine Unit and Incineration, Gas Compression, Gas Re-injection, Membrane and Pre-Treatment, NGL Recovery, Power Generation and…
Client : PT. Badak NGL Co.Capacity : 2.95 Million TonsPeriod : March 1997 – November 1999Location : Bontang, East Kalimantan EPC Work for Train-H LNG Processing plant including Plant-1 CO2 Removal Unit (aMDEA solvent – BASF licensor), Plant-2 Dehydration & Mercury Removal Unit, Plant-3 Fractionation Unit, Plant-4 Refrigeration Unit and Plant-5…
Client : PT. Badak NGL Co.Capacity : 2.6 Million MTPA Of LNGPeriod : March 1995 – November 1997Location : Bontang, East Kalimantan EPC Work for Train-G LNG Processing plant including Plant-1 CO2 Removal Unit (Ucarsol solvent – UOP licensor), Plant-2 Dehydration & Mercury Removal Unit, Plant-3 Fractionation Unit, Plant-4 Refrigeration Unit…
Client : PT. Badak NGL., Co.Capacity : 2.6 Million MTPA Of LNGPeriod : March 1991 – November 1993Location : Bontang, East Kalimantan EPC Work for Train-F LNG Processing plant including Plant-1 CO2 Removal Unit (Ucarsol solvent – UOP licensor), Plant-2 Dehydration & Mercury Removal Unit, Plant-3 Fractionation Unit, Plant-4 Refrigeration Unit and…