EPC Rawa Modification Project
Client : ConocoPhillips (Grissik) Ltd
Capacity : 25 MMSCFD & 45 MMSCFD
Period : January 2012 – October 2013
Location : Grissik, Letang – South Sumatra
IKPT has been completed to build Rawa Modification Project (Brown Field Project) location in Southern Sumatra. This Project is conversion from Oil Plant to be Gas Plant with capacity is 25 MMScfd.
In addition, some wells re-activation (Rawa Well # 2, Letang Well # 1, # 3, # 4 and Central Well # 1, # 3) and optimization of Letang Central Station was also conducted to increase gas production up to 45 MMSCFD.
With a high level of difficulty (working at Life Plant) and tight schedule, IKPT can keep Work Without Accidents (Zero Accident) or Losing Time of Work ue to an Accident (Lost Time Incident / LTI) with total man hours reached 1.767.962 man-hours.