Singa Gas Development Project
Client : PT. Medco Lematang E&P
Capacity : 85 MMSCFD
Period : January 2008 – January 2011
Location : Lematang, South Sumatra
Engineering, procurement, installation, and commissioning of Production facilities which includes the following facilities: Flow lines for five Singa wells Gas processing plant, including CO2 Removal unit and sulfur recovery include stand alone gas-processing facility, with a total capacity to process 85 MMSCFD and to produce 50 MMSCFD of treated sales gas, and minimum of 3,000 bpd of produced water (12” Dia x 40 Km.) – Pipeline to transport gas sales to Pagar-Dewa pipeline junction station for PT. PGN.