Infrastructure

CP-107 of Railway Systems & Trackwork of Jakarta Mass Rapid Transit Project

CP-107 of Railway Systems & Trackwork of Jakarta Mass Rapid Transit Project

Client      :   PT. Mass Rapid TransportationCapacity :    ”  –  “Period     :   July 2015 – April 2018Location :   Jakarta CP 107: Railway Systems and Track work:a). Preliminaries and General Requirementsb). Part-l Substation Systemc). Part – 2 Overhead Contact Systemd). Part-3 Power Distribution Systeme). Part-4 Signaling Systemf). Part- 5 Telecommunication Systemg) Part-6 Facility…

Banyu Urip EPC-2 Pipeline Project

Banyu Urip EPC-2 Pipeline Project

Client      :   Exxon Mobil Cepu Ltd.Capacity :   Pipeline 20″ x 72 KmPeriod     :   Desember 2011 – August 2013Location :   Banyu Urip – Bojonegoro, East Java The EPC-2 Project “Onshore Export Pipeline System” is part of Banyu Urip Field Project at Bojenegoro, East of Java to support Indonesian oil production to achieve 1 million barrel production…

Tuban Main Transit Terminal and Pipeline East Java Project

Tuban Main Transit Terminal and Pipeline East Java Project

Client      :  PT. Pertamina (Persero)Capacity :   ” – “Period     :  Agustus 2007 – Februari 2010Location :  Tuban, Jawa Timur Fuel Loading/ Back Loading by: SPM 150,000 DWT :– for Loading Diesel Fuel and Kerosene (6 Km. Dia 32”) SPM 35,000 DWT– for Loading Premium and Back Loading Kerosene and Diesel fuel…

Gas Transmission and Compression Facility (Package II) Project

Gas Transmission and Compression Facility (Package II) Project

Client      :   PT. PERTAMINA (Persero)Capacity :   300 MMSCFDPeriod     :   July 2004 – June 2006Location :   Benuang, Prabumulih, Pagardewa, South Sumatra IKPT, as a leading national contractor in EPC projects for the oil and gas, in 2006 has been completed Sumbagsel Gas Development Project (PPGS) Package-II owned by Pertamina with a value of more than USD…

LNG Expansion Project 3rd Dock LNG and LPG Export Terminal and LPG Storage

LNG Expansion Project 3rd Dock LNG and LPG Export Terminal and LPG Storage

Client      :    PT. Badak NGL Co.Capacity :    ” – “Period     :    June 1996 – May 1998Location :    Bontang, East Kalimantan Basic design and EPC work for LNG & LPG Ship Loading Dock No. 3, which consists of 9 loading arms (5 LNG, 4 LPG) and gangway. The work includes 1 LPG Tank…