Dieng Small Scale Geothermal Project
Owner: PT Geo Dipa Energi (Persero)
Capacity: 1 x 10 MW
Period: August 2019 – July 2021
Location: Dieng, Wonosobo, Central Java
Owner: PT Geo Dipa Energi (Persero)
Capacity: 1 x 10 MW
Period: August 2019 – July 2021
Location: Dieng, Wonosobo, Central Java
PT Medco Cahaya Geothermal (MCG), a subsidiary of PT Medco Power Indonesia (Medco Power), has successfully commenced the commercial operation of the Ijen Geothermal Power Plant (GPP) in East Java on February 7, 2025. The Ijen GPP is the first geothermal power generation facility in East Java province and will be developed with a total…
Client : PT. Pertamina Geothermal EnergyCapacity : 20 MWPeriod : November 2010 – March 2013Location : Lahendong – North Sulawesi PGE (Pertamina Geothermal Energy), a subsidiary of PT Pertamina (Persero) carrying out development Geothermal Power Plant (PLTP) Lahendong – 4 in Tompaso, North Sulawesi with a capacity of 20…
Client : Millenium Challenge Account-Indonesia (MCA-I)Capacity : 316.8 kWpPeriod : February 2017 – December 2017Location : Karampuang Island, Mamuju – West Sulawesi IKPT was completed build Solar Photovoltaic Electricity in Karampuang Island, Mamuju, West Sulawesi. The project is aimed at developing 4 Solar Photovoltaic power plant with total capacity of 316.8 kWp…
The Consortium PT Inti Karya Persada Tehnik (IKPT) and PT Wasa Mitra Engineering (WME) has signed an Engineering, Procurement and Construction (EPC) contract for the development of Patuha-2 Geothermal Power Plant Project with PT Geo Dipa Energi (Persero). The signing ceremony took place on December 12, 2024, in Jakarta and was attended by representatives from…
Consortium of Sumitomo Corporation, PT Inti Karya Persada Tehnik and PT Wasa Mitra Engineering has signed the contract for the Engineering, Procurement and Construction (EPC) Contract for the expansion of Muara Laboh Geothermal Power Project (Project) with PT Supreme Energy Muara Laboh (SEML) on December 24, 2024. The Project will have a Nominal Continuous Rating…
Owner: PT Pertamina Geothermal EnergyCapacity: 1 x 55 MWPeriod: December 2016Location: Cilegon, Banten EPC (Subcontractor to Marubeni) for FCRS (Fluid Collection and Reinjection System) and BOP (Balance of Plant).