Dieng Small Scale Geothermal Project
Owner: PT Geo Dipa Energi (Persero)
Capacity: 1 x 10 MW
Period: August 2019 – July 2021
Location: Dieng, Wonosobo, Central Java
Owner: PT Geo Dipa Energi (Persero)
Capacity: 1 x 10 MW
Period: August 2019 – July 2021
Location: Dieng, Wonosobo, Central Java
PT Inti Karya Persada Tehnik (IKPT) has been awarded the FEED Green Refinery RU III-Plaju Project from PT Kilang Pertamina Internasional (KPI), a subsidiary of PT Pertamina (Persero). Contract has been signed on July 11, 2025 and the Project Kick Off Meeting (KOM) was held on July 15, 2025 at Wisma IKPT, Jakarta. PT KPI…
As part of the efforts to encourage national electricity and energy security, Indonesian Electricity Magazine held an Awarding Night for the 2024 Indonesian Electricity Awards which took place on Thursday, May 2 2024, at Hotel Mulia Ballroom 1, Senayan, South Jakarta. This award is a form of appreciation for the company’s achievements and also attention…
Client : Millenium Challenge Account-Indonesia (MCA-I)Capacity : 316.8 kWpPeriod : February 2017 – December 2017Location : Karampuang Island, Mamuju – West Sulawesi IKPT was completed build Solar Photovoltaic Electricity in Karampuang Island, Mamuju, West Sulawesi. The project is aimed at developing 4 Solar Photovoltaic power plant with total capacity of 316.8 kWp…
PT Medco Cahaya Geothermal (MCG), a subsidiary of PT Medco Power Indonesia (Medco Power), has successfully commenced the commercial operation of the Ijen Geothermal Power Plant (GPP) in East Java on February 7, 2025. The Ijen GPP is the first geothermal power generation facility in East Java province and will be developed with a total…
Consortium of Sumitomo Corporation, PT Inti Karya Persada Tehnik and PT Wasa Mitra Engineering has signed the contract for the Engineering, Procurement and Construction (EPC) Contract for the expansion of Muara Laboh Geothermal Power Project (Project) with PT Supreme Energy Muara Laboh (SEML) on December 24, 2024. The Project will have a Nominal Continuous Rating…
Owner: PT Pertamina Geothermal EnergyCapacity: 1 x 55 MWPeriod: December 2016Location: Cilegon, Banten EPC (Subcontractor to Marubeni) for FCRS (Fluid Collection and Reinjection System) and BOP (Balance of Plant).