Dieng Small Scale Geothermal Project
Owner: PT Geo Dipa Energi (Persero)
Capacity: 1 x 10 MW
Period: August 2019 – July 2021
Location: Dieng, Wonosobo, Central Java
Owner: PT Geo Dipa Energi (Persero)
Capacity: 1 x 10 MW
Period: August 2019 – July 2021
Location: Dieng, Wonosobo, Central Java
PT Medco Cahaya Geothermal (MCG), a subsidiary of PT Medco Power Indonesia (Medco Power), has successfully commenced the commercial operation of the Ijen Geothermal Power Plant (GPP) in East Java on February 7, 2025. The Ijen GPP is the first geothermal power generation facility in East Java province and will be developed with a total…
Client : PT. Pertamina Geothermal EnergyCapacity : 20 MWPeriod : November 2010 – March 2013Location : Lahendong – North Sulawesi PGE (Pertamina Geothermal Energy), a subsidiary of PT Pertamina (Persero) carrying out development Geothermal Power Plant (PLTP) Lahendong – 4 in Tompaso, North Sulawesi with a capacity of 20…
IKPT has successfully completed commissioning & performance test of Siberut Aggregated Biomass Gasification Power Plant (SABPP) Project. SABPP is one of the project funded by Millennium Challenge Corporation (MCC) in collaboration with Government of Indonesia, through Millennium Challenge Account Indonesia (MCA-I). The project will supply 700 kW of power to total of 1,181 Households that…
Client : Millenium Challenge Account-Indonesia (MCA-I)Capacity : 316.8 kWpPeriod : February 2017 – December 2017Location : Karampuang Island, Mamuju – West Sulawesi IKPT was completed build Solar Photovoltaic Electricity in Karampuang Island, Mamuju, West Sulawesi. The project is aimed at developing 4 Solar Photovoltaic power plant with total capacity of 316.8 kWp…
Owner: PT Pertamina Geothermal EnergyCapacity: 1 x 55 MWPeriod: December 2016Location: Cilegon, Banten EPC (Subcontractor to Marubeni) for FCRS (Fluid Collection and Reinjection System) and BOP (Balance of Plant).
Following the EPC Contract signing on December 24, 2024, Supreme Energy Muara Laboh (SEML) cordially invited EPC Contractor to attend the EPC Contract Handover Ceremony for Muara Laboh Stage-2 Geothermal Power Plant Project, which was held on February 13, 2024 at their new office in Jakarta. The ceremony was attended by the representative of SEML…