Infrastructure and Power

Coal Boiler Project

Coal Boiler Project

Client      :  PT. Pupuk Kalimantan TimurCapacity :  2  X  220 MTPHPeriod     : January 2010 – August 2012Location : Bontang, East Kalimantan In August 2012,  IKPT has been successfully to build coal boiler plant with capacity 2 x 220 MTPH of Circulating Fluidized Bed (CFD) Boiler at PT Pupuk Kalimantan Timur, Bontang –…