Jabung Betara Complex Development Phase 3 and 4 Gas Plant Project
Client : Petrochina International Jabung Ltd.
Capacity : 100 MMSCFD
Period : Mei 2003 – Agustus 2005
Location : Jabung, Jambi – Sumatera
Detail Engineering, Procurement and Construction for the Betara Gas Plant, Gas Recovery Facilities, Infrastructure
Betara Gas Plant: Amine Unit and Incineration, Gas Compression, Gas Re-injection, Membrane and Pre-Treatment, NGL Recovery, Power Generation and Distribution, Process Building and Shelter, Product Storage, Sales and Gas Metering and Tie-in to PGN line, Utilities, Water Disposal, Gas Recovery System
Infrastructure: Administration, Maintenance and Safety Facilities, Construction Camp, Permanent Camp, Road Scada & Integrated Control System, Telecommunication.
Main Equipment: Boiler & HRSG, Nitrogen Generator, Flare, Water Treatment, WWT, Combustion Turbine Generator (CTG) & EDG, Fuel Gas Booster Compressor, Pumps, Heat Exchanger, Air Cooler, Pressure Vessel, Switchgear, Transformer, UPS, DCS, Gas Turbine Generator (3 x 25 MW), etc.