LNG Expansion Project 3rd Dock LNG and LPG Export Terminal and LPG Storage
Client : PT. Badak NGL Co.
Capacity : ” – “
Period : Juni 1996 – Mei 1998
Location : Bontang, Kalimantan Timur
Basic design and EPC work for LNG & LPG Ship Loading Dock No. 3, which consists of 9 loading arms (5 LNG, 4 LPG) and gangway. The work includes 1 LPG Tank (40,000m3). Dredging of turning basin and in front of the dock with total dredging volume 1,600,000m3 of soft and hard materials. Reclamation of tankage area of LPG Tank with good sand material from dredging area.