Tuban Main Transit Terminal and Pipeline East Java Project
Client : PT. Pertamina (Persero)
Capacity : ” – “
Period : Agustus 2007 – Februari 2010
Location : Tuban, Jawa Timur
Fuel Loading/ Back Loading by: SPM 150,000 DWT :
– for Loading Diesel Fuel and Kerosene (6 Km. Dia 32”) SPM 35,000 DWT
– for Loading Premium and Back Loading Kerosene and Diesel fuel Subsea Pipeline
– 32” SPL 6 Km one line
– 18” SPL 3 Km 3 lin
Offshore Pipeline
– loop offshore 16” 8 km
Onshore Pipeline
– 16” 141 k
Storage Tank by:
4 x @50,000 Kl (fixe dome/umbrella roof tank) for dIesel fuel
3 x @30,000 Kl (fixe dome/umbrella roof tank) for kerosene
3x @25,000 Kl (Floating roof tank) for Premium Gasoline
3 x @5000 Kl (Floating roof tank) for HOMC from TPPI Distribution Filling Bays consist of : Premium: 3 bays, each bay equipped by 3 filling Points Solar: 3 bays, each bay equipped by 3 filing Point
Kerosene: 5 bays, equipped by 1 Filling Point.