Tuban Aromatic Plant Project
Client : PT. Trans Pacific Petrochemical Indotama
Capacity : 1,270,000 M T/Y
Period : Juni 2004 – Mei 2006
Location : Tuban – Jawa Timur
- Single Point Mooring (SPM) with the capacity 185,000 DWT
- Subsea Pipe Line dia. 36”, with the length 6,000 meter (at the water depth 0 – 27 meter)
- Tankage:
- Feed Stock Tank: 6 units x 60,000 m3 with the total working capacity 360,000 m3
- Product Tank: 26 units at the various capacities, with the total working capacity 265, 400 m3
- Utility Tank: 9 units at the various capacities, with the total working capacity 29,560 m3
- Spherical Tank: 3 units at the various capacities, with the total working capacity 28,600 m3
- Combustion Turbine Generator (GTG) (3 X 21,5 MW)