1FEED of Copper Smelter Plant 1.3 MTPAOther IndustryOutotec / PT. Amman Mineral IndustriSumbawa, NTBJan 2019 - May 2019
2Vopak Tank & Structure AssessmentInfrastructurePT. Vopak Terminal MerakMerak, BantenJuly 2018 - August 2018
3PMC Support for Jakarta Tank TerminalInfrastructurePT. Jakarta Tank TerminalTanjung Priok, North JakartaJune 2018 - October 2018
4Analysis of Pipe Rack Structur D-020ChemicalPT. Sulfindo AdiusahaMerak, BantenMay 2018 - July 2018
5Engineering Work for Modification TW-2404ChemicalPT. Asahimas ChemicalAnyer, BantenApril 2018 - June 2018
6DE HVAC for Doap and Soap Plant Other IndustryPT. Unilever IndonesiaSei Mangkei, South Sumatra9 April 2018 - 29 June 2018
7Construction Management Dove expansion projectOther IndustryPT. Unilever IndonesiaSei Mangkei, South Sumatra9 April 2018 - 29 June 2018
8Engineering Consultant PertaminaOil & GasPT. PertaminaVarious Pertamina Refinery6 April 2018 - 31 May 2018
9DE Dove Expansion ProjectOther IndustryPT. Unilever IndonesiaSei Mangkei, South Sumatra4 April 2018 - 29 June 2018
10Analisa struktur D 020
ChemicalPT. Asahimas ChemicalMerak, Banten14 March 2018 - 27 April 2018
11CAP Solar PV 200 kW
Power PlantPT. Chandra Asri PetrochemicalCilegon, Banten12 March 2018 - 20 September 2018
12Jasa Pembuatan Dokumen Pengadaan Pembangunan 1 Unit Smooth Fluid, 1 Unit Surface Condenser & Revamping Unit SWS AccossoriesOil & GasPT. Pertamina (Persero)Dumai, Pekanbaru, RiauMarch 2018 - May 2018
13Vopak Tank & Structure AssessmentOtherPT. Vopak Terminal MerakMerak, Banten7 March 2018 - 31 May 2018
14Additional FEED Crude Open Access Ru IIIOil & GasPertamina RU - IIIPlaju, South Sumatra7 March 2018 - 31 May 2018
15Pre FEED Wood Pellet and Biomass Power PlantInfrastructurePT. Cahaya Energi HutaniSamarinda, East KalimantanFebruary 2018 - July 2018
16FEED - Tank Smooth Fluid, 1 Unit Surface Condenser & Revamping Unit SWS C/S AccessorieOil & GasPT. Pertamina RU-II, DumaiDumai, Pekanbaru, RiauFebruary 2018 - May 2018
17MCCI: Pipe Modification 2E-1731AChemicalMitsubishi Chemical IndoneisaCilegon, Banten26 Feb 2018 - 30 March 2018
18Remote Island Project
Other IndustryVarious19 Feb 2018 - 30 March 2018
10FS NH3 Storage
ChemicalPT. Asahimas ChemicalEast Java14 Feb 2018 - 30 March 2018
20Tank Smooth Fluid 1 Unit Surface Condenser & Revamping Unit SWS C/W AccossorieOil & GasPT. Pertamina RU II, DumaiDumai, Pekanbaru, RiauFebruary 2018 - May 2018
21PMC RDMP RU VOil & GasBalikpapan, East Kalimantan5 February 2018 - 30 April 2018
223D Modelling Power PlantPower PlantJakarta31 January 2018 - 29 June 2018
23Study of R22 Refigerant System Changes at VCM-1 PlantChemicalPT. Asahamas ChemcalAnyer, BantenJanuary 2018 - March 2018
24Jasa Engineering PetrochemicalPT. Trans Pacific Petrochemical IndotamaTuban, Eas JavaJanuary 2018 - March 2018
25Design of Tank Na2SO3
ChemicalPT. Asahimas ChemicalAnyer, Banten22 November 2017 - 30 April 2018
26Eng. Services - Heater Revamp ProjectPetrochemicalPT. Chandra Asri PetrochemicalCilegon, BantenSeptember 2017 - February 2019
27Assessment & Redesigning of ConveyorChemicalPT. Sulfindo AdiusahaMerak, BantenAugust 2017 - September 2017
28Pipe Line Back Loading from TBBM Tuban to TPPIOil & GasPT. Pertamina (Persero)Cilegon, West JavaAug 2017 - Feb 2018
29FEED - Crude Access Open III (from Bangka Strait to Refinery Unit III)Oil & GasPT. Pertamina (Persero)Plaju, Palembang, South SumatraAugust 2017 - February 2018
30Back Loading Tuban to TPPIProject Management ConstructionPT. Pertamina (Persero)Tuban, East JavaAugust 2017 - February 2018
31Furnace Structure Analysis for FU-5401ChemicalPT. Asahimas ChemicalAnyer, BantenJuly 2017 - September 2017
32Engineering Work for Modification of New Reboiler TW-2404ChemicalPT. Asahimas ChemicalAnyer BantenJuly 2017 & September 2017
33Steel Structure Reinforcement Work for Existing Cracker Furnace FU-5401 at VCM-2 PlantChemicalPT. Asahimas ChemicalAnyer, BantenJuly 2017 - September 2017
34SULUT-1 CFSPP 2 x 50 MWInfrastructureBolaang Mangondow, South Sulawesi13 June 2017 - 29 June 2018
35Pre-FEED - Blanket EngineeringOil & GasJOB Pertamina - Medco E&P TomoriSenoro, SulawesiMay 2017 - December 2018
36Various Engineering Services Chemical - VariousPT. Unilever Indonesia TbkCikarang, West Java2017
37Foundation Evaluation & Design for New R-051 & Foundation Inspection and Leveling for Ethylene Pump P5 & P6 and Ethylene Tank T2ChemicalPT. Sulfindo AdiusahaMerak, BantenMay 2017 - September 2017
38Additional Work Gajah Mada ProjectOther IndustryPT. Unilever Indonesia TbkCikarang, West JavaApril 2017
39FEED - 400 KTA New Swing Plant HDPE LLDPEChemicalPT. Chandra Asri Petrochemical TbkCilegon, BantenFebruary 2017 - June 2017
40Engineering Services - Modification of New Reboiler TW-2404ChemicalPT. Asahimas ChemicalJakarta13 March 2017 - 30 April 2017
41Turn Around Execution ReviewChemicalPT. Tuban Petrochemical IndustriesTuban, East JavaFebruary 2017 - March 20-17
42Additional Work Gajah Mada ProjectOther IndustryPT. Unilever Indonesia TbkCikarang, West JavaJanuary 2017
43F/S Humpuss Mini Refinery Relocation and Development ProjectRefineryPT. Humpus Pengolahan MinyakBojonegoro, East JavaNovember 2016 - February 2017
44DED - Solar Photovoltaic Electricity - Power PlantInfrastructurePT. Puriver IndonesiaSouth East SulawesiNovember 2016 - December 2016
45FEED - New Gas Entrance (Lean Gas)LNGPT. Badak NGL Co.Bontang, East KalimantanOctober 2016 - February 2017
46FEED - work of Solar Photovoltaic Electricity for Karampuang IslandInfrastructurePT. Sky Energy IndonesiaKarampuang Island, West SulawesiSeptember 2016 - December 2016
47Detail Engineering Design Services - Siberut Agregated Biomass Gassification Power Plant InfrastructurePT. Charta Putra IndonesiaSiberut, West SumatraSeptember 2016 - December 2016
48Technical Assessment for Power Pack 3.5 MW BiomassInfrastructurePT. Arkon Prima IndonesiaJakartaSeptember 2016
49Total Investment Cost Estimation for Construction Services for Butadiene Extraction Plant Expansion (Engineering)ChemicalToyo Engineering CorporationCilegon, BantenJuly 2016 - December 2016
50Gajah Mada ProjectOther IndustryPT. Unilever Indonesia TbkCikarang, West Java-
51Additional Bumble Bee ProjectOther IndustryPT. Unilever Indonesia TbkCikarang, West Java-
52Bumble Bee ProjectOther IndustryPT. Unilever IndonesiaCikarang, West Java-
53Civil Study for Existing BuildingOther IndustryPT. Unilever Indonesia TbkCikarang, West JavaJanuary 2016 - March 2016
54civil & Structural Design Calculation Verification for Steel Structure of SiloOther IndustryPT. Unilever Indonesia TbkCikarang, West JavaJanuary 2016 - February 2016
55Fuel Gas Cooler No. 1 (FGC-1) & FGC-3Oil & GasPT. Pertamina RU-IIIPlaju, Palembang Sumatra SelatanJanuary 2016 - February 2016
56FEED - sonolator PWL Skin FactoryOther IndustryPT. Unilever Indonesai TbkCikarang, West javaDecember 2015 - March 2016
57Civil Study Existing Building for Dodgeball ProjectOther IndustryPT. Unilever Indonesia TbkCikarang, West JavaDecember 2015
58FEED Skin FactoryOther IndustryPT. Unilever Indonesia TbkCikarang, West Java-
59Blangket Engineering for PT. Cabot IndonesiaChemicalPT. Cabot IndonesiaMerak, BantenSeptember 2015 -
60Estimation Work for PBI-BDX PlantChemicalPT. Chandra Asri PetrochemicalCilegon, West JavaSeptember 2015 - December 2015
61Engineering Services for ASC-FU-5401 RevampingChemicalPT. Asahimas Subentra ChemicalCilegon, BantenSeptember 2015
62Flare Stack Structure Analysis ME2 TG Isolation Valve ProjectChemicalPT. Cabot IndonesiaMerak, BantenJune 2015 - June 2016
63Review/Consultation work on Feasibility Study Service for Nippon Shokubai EO-EOD Project (Indonesia) / FEEDChemicalToyo Engineering CorporationJakartaJune 2015 - September 2015
64Package -8 - Engineering Assessment Htdc UnitChemicalPT. Sulfindo AdiusahaMerak, BantenApril 2015 - February 2016
65Package-4 - Engineering Assessment Fire Water System and Hcl Storage Vent SystemChemicalPT. Sulfindo AdiusahaMerak, BantenApril 2015 - January 2016
66Blanket EngineeringChemicalPT. Sulfindo AdiusahaMerak, BantenFebruary 2015 - February 2016
67Shell DPC Demo Unit ProjectChemicalToyo Engineering CorporationPetronas MalaysiaJanuary 2015
68Civil StudyOther IndustryPT. Unilever Indonesia TbkCkarang, West Java-
69FEED Skin FactoryOther IndustryPT. Unilever Indonesia TbkCikarang, West Java-
70Study Existing StructuralOther IndustryPT. Unilever Indonesia TbkCikarang, West Java-
71Additional FEED PipingOther IndtrustryPT. Unilever Indonesia TbkCikarang, West Java-
72FEED PipingOther IndustryPT. Unilever Indonesia TbkCikarang, West Java-
73CE Solvolysis ProjectOther IndustryPT. Unilever Indonesia TbkCikarang, West Java-
74FEED - Additional New Scope for DodgeballOther IndustryPT. Unilever Indonesia TbkCikarang , West JavaOctober 2014 - November 2014
75Package-1, Engineering Assesment HTD UnitChemicalPT. Sulfindo AdiusahaMerak, BantenOctober 2014
76CE Solvolysis ProjectOther IndustryPT. Unilever Indonesia TbkCikarang, West JavaApril 2014 - June 2014
77FEED - Piping Design Project Dodgeball HPCL LiquiedOther IndustryPT. Unilever Indonesia TbkCikarang, West JavaJuly 2014 - September 2014
78Project Management Consultant (PMC) ServicesChemicalPT. Panca Amara UtamaBanggai, SulawesiDecember 2012 - November 2013
79Onshore FEED Services of Ethylene Plant Capacity Expansion from 600 KTA to 820KTAChemicalPT. Chandra Asri PetrochemicalCilegon - MerakJuly 2012 - December 2012
80Plant for Producing varies of Sodium Lauryl Ether Sulfate and Sodium Lauryl SulfateChemicalPT. BASF Chemical IndonesiaDepok - West JavaMay 2012 - June 2012
81FEED Collie Urea ProjectChemicalPerdaman Chemicals and FertilisersPerth, AustraliaJuly 2009 - April 2010
82FEED DCS/PLC and SIL and Debottlenecking DSM Melamina BontangChemicalDSM Kaltim MelamineBontang, East Kalimantan18 September 2007 - 18 October 2008
83Kontrak No. 090/E20200/2011-S0 Kerjasama Pembuatan Dokumen Engineering Proyek-Proyek (Umbrela Contract for Engineering Package)Oil & GasPT. Pertamina (Persero)CilacapApril 2011 - April 2014
84FEED Pertamina Contract No. 090/E20200/2011-S0 fro FEED Offshite Batery Limit Kereosente treater Ru-V BalikpapanOil & GasPT. Pertamina (Persero)Balikpapan4 April 2011 - 3 April 2013
85FEED Pertamina Contract No. 090/E20200/2011-S0 for FEED Offshite Batery Limit Kereosene treater RU II DumaiOil & GasPT. Pertamina (Persero)Dumai4 April 2011 - 3 April 2013
86FEED Pertamina Contract No. 090/E20200/2011-S0 for Offsite Battery limit dan non-licensed inside battery limit for Blusky CilacapOil & GasPT. Pertamina (Persero)Cilacap4 April 2011 - 3 April 2013
87FEED Pertamina Contract No. 090/E20200/2011-S0 for REVIEW Flare System FOC-I RU-IV Cilacap (Addendum-1)Oil & GasPT. Pertamina (Persero)Cilacap4 April 2011 - 3 April 2013
88FEED Pertamina Contract No. 090/E20200/2011-S0 for FEED New Nitrogen Plant for Bluesky Cilacap Pertamina RU-IVOil & GasPT. Pertamina (Persero)Cilacap4 April 2011 - 3 April 2013
89FEED Pertamina Contract No. 090/E20200/2011-S0 for Review FEED Proyek CCT Lawe-LaweOil & GasPT. Pertamina (Persero)Lawe-Lawe4 April 2011 - 3 April 2013
90FEED Pertamina Contract No. 090/E20200/2011-S0 for Review Review SOW Bluesky CilacapOil & GasPT. Pertamina (Persero)Cilacap4 April 2011 - 3 April 2013
91FEED Pertamina Contract No. 090/E20200/2011-S0 for Technical Bid Criteria & Evaluation & Studi SOW Document for Bluesky CilacapOil & GasPT. Pertamina (Persero)Cilacap4 April 2011 - 3 April 2013
92FEED Pertamina Contract No. 090/E20200/2011-S0 for Study on Crude Terminal Facilities Integration for Lawe-lawe Centralized Crude terminalOil & GasPT. Pertamina (Persero)Cilacap4 April 2011 - 3 April 2013
93FEED Pertamina Contract No. 090/E20200/2011-S0 for Review Supply External Gas asFuel Gas System di Pertamina RU·IV CilacapOil & GasPT. Pertamina (Persero)Cilacap4 April 2011 - 3 April 2013
94FEED Pertamina Contract No. 090/E20200/2011-S0 for Feasibility Evaluation and Estimate Change Order Creation Project Counter Liquid Waste Management Refinery RU III PlajuOil & GasPT. Pertamina (Persero)Cilacap4 April 2011 - 3 April 2013
95FEED Pertamina No. 006/E20200/2014-S0 for Contract No. 090/E20200/2011-S0 for New Cooling Tower Capacity 6400 M31 Hour in RU III Plaju UtilityOil & GasPT. Pertamina (Persero)CilacapMay 2014 - July 2014
96FEED Pertamina No. 007/E20200/2014-S0 for Contract No. 090/E20200/2011-S0 for FEED Proyek Wax Plant CilacapOil & GasPT. Pertamina (Persero)CilacapSeptember 2014 - November 2014
97FEED Arun Receiving – Hub & Regasification TerminalOil & GasPT. PertaminaArun, AcehMarch 2011 - June 2011
98Pekerjaan “Engineering Proyek Pengelolaan Limbah Cair Kilang RU III” No. S10PL00151Oil & GasPT. Pertamina Refinery Unit III Plaju, Sumatra SelatanPlaju, Palembang Sumatra SelatanOctober 2010 - January 2011
99F/S TTU BBM TimikaInfrastructureLekomarasTimika, PapuaJune 2010 - August 2010
100FEED of Cement Plant & Quarry ExplorationInfrastructurePT. Freeport Ind. & PEMDA TK-1, PapuaTimika, PapuaMarch 2009 - September 2009
101Engineering Services Contract for PetrofactOil & GasPetrofacRefer to SupplementJuly 2006 - February 2009
102Supplement No. 1 for Lump Sump Work for Water Injection System NC-74Oil & GasPetrofac – Eni Oil Co. LtdLibyaAugust 2006 - December 2006
103Supplement No. 2 in Services Contract for Lump Sump Work for Sourth Pars Phase 11 (SP-11)Oil & GasPetrofac - Nioc - IranIranAugust 2006 - January 2007
104Supplement No. 3 to Services Contract for Lump Sum Work for A/100 Low Pressure FacilitiesOil & GasPetrofacLibyaSeptember 2006 - February 2007
105Supplement No. 4 to Services Contract for Lump Sum work for A/100 Low Pressure Facilities, LibyaOil & GasPetrofacThailandDecember 2006 - May 2007
106Supplement No. 5 to Services Contract for Lump Sum work for 6th Gas Separation Plant (GSP)Oil & GasPetrofacThailandDecember 2006 - May 2007
107Supplement No. 6 to Services Contract for Lump Sum work for Brass River NiegeriaOil & GasPetrofacNigeriaNovember 2006 - April 2007
108Supplement No.7 to Services Contract for Lump Sum work for Engineers Dispatchment to Sharjah OfficeOil & GasPetrofacUEAJanuary 2007 - July 2007
109Supplement No. 10 to Services Contract for Lump Sum work for Booster Station – 160 (BS-160)Oil & GasPetrofacKuwaitApril 2007 - October 2007
110Supplement No. 14 to Services Contract for Lump Sum work for Jibar Development ProjectOil & GasPetrofacSyriaJuly 2007 - December 2007
111Supplement No. 15 to Services Contract for Lump Sum work for Gassi Touil LNG Project of Sonatrach, Azrew, Algeria.LNGPetrofacAlgeriaJuly 2007 - January 2008
112Supplement No. 16 to Services Contract for Lump Sum work for El Merk CPF DevelopmentOil & GasPetrofacAlgeriaOctober 2007 - March 2008
113Supplement No. 17 to Services Contract for Lump Sum work for Effuent Water Injection Phase 1 & Sea Water Injection Phase 2 Project for KOCOil & GasPetrofacKuwaitDecember 2007 - June 2008
114Supplement No. 18 to Services Contract for Lump Sum work for Menzel Lejment East (MLE) Block 405 BOil & GasPetrofacLybiaMarch 2008 - July 2008
115Supplement No. 19 to Services Contract for Lump Sum work for EL-Andalus LNG Arzew Project of Sonatrach, Azrew, Algeria.Oil & GasPetrofacAlgeriaFebruary 2008 - October 2008
116Supplement No. 20 to Services Contract for Lump Sum work for Re-FEED and El Merk Phase-IIOil & GasPetrofacAlgeriaNovember 2008 - February 2009
117FEED Pertamina Contract No. 090/E20200/2011-S0 for Offsite Battery limit dan non-licensed inside battery limit for Blusky CilacapOil & GasPetrofacQatarAugust 2007 - February 2008
118Supplement No. 22 to Services Contract for Lump Sum work for and Man-hour Basis for Gassi Touil FEED ProjectOil & GasPetrofacAlgeriaNovember 2008 - July 2008
119Supplement No. 23 to Services Contract for Lump Sum work for Yanbu Export Refinery Project – Package 1Oil & GasPetrofacChinaSeptember - 2008 - November 2008
120Supplement No. 24 to Services Contract for Lump Sum work for Marsa El Brega LNG Project of Lybia National Oil Company (NOC), Libya.LNGPetrofacLibyaNovember 2008 - February 2009
121Addendum No. 1 of Supplement No. 18Oil & GasPetrofacLibyaNovember 2008 - February 2009
122Addendum No. 1 of Supplement No. 21Oil & GasPetrofacQatarNovember 2008 - February 2009
123Supplement No. 25 to Services Contract for Lump Sum work for Gassie Touil FEEDOil & GasPetrofacLibyaNovember 2008 - February 2009
124Supplement No. 26 to Services Contract for Lump Sum work for EPC Proposal for Gassie Touil FEEDOil & GasPetrofactLibyaJuly 2009 - August 2009
125Supplement No. 27 to Services Contract for Lump Sum work for Early Start Engineering Services ASAB ADCO ProjectOil & GasPetrofactSaudi ArabiaSeptember 2008 - August 2009
126Pre-FEED MatindokOil & GasPT. Pertamina (Persero)Matindok, Central SulawesiSeptember 2007 - March 2008
127Pre-Feasibility Study of Cement Plant & QuarryInfrastructurePT. Freeport Ind. & PEMDA TK 1 PapuaTimika, PapuaJune 2008 - August 2008
128Hazop Review Storage & Loading FacilitiesOil & GasPT. Pertamina (Persero)PT. Badak, BontangJuly 2006 - September 2006
129BCD Phase-IV, Jambi Petrochina FEED StudyOil & GasPetrochinaJambi Sumatra – IndonesiaJuly 2007 - September 2007
130FEED For Ethane Plus Extraction Project (EPEP)LNGPT. Badak NGL. Co.Bontang, East KalimantanAugust 2005 - February 2006
131Engineering Services for Qatar Gas Train 5,6, Chiyoda’s SubcontractorOil & GasChiyoda CorporationQatarMarch 2005 - February 2006
132FEED LNG Increment Project (LIP)LNG PT. Badak NGL. Co.Bontang, East KalimantanDecember 2004 - August 2005
133FEED of Smokeless Flare and Smokeless Burn Pit ProjectLNGPT. Badak NGL.Bontang, East KalimantanJuly 2003 - November 2003
134FEED Tangguh
LNGPT. Pertamina (Persero)Wiriagar, Irian JayaApril 2000 - March 2001
135FEED Train-I LNG BontangLNGPT. Pertamina (Persero)Bontang, East Kalimantan27 March 2001 - 25 September 2001
136FEED Train-H LNG ProjectLNGPertaminaBontang, East KalimantanFebruary 1996 - July 1996
137Seraya Island ProjectOil & GasChiyoda CorporationShell Corporation/ Chiyoda, SingaporeAugust 1994 - October 1995
138Engineering Services for Bandar RefineryOil & GasChiyoda CorporationIran Petroleum Co/ Chiyoda/ SnamprogettiMarch 1990 - January 1992
139FEED LNG Incremen (LIP)LNGPT. Badak NGL Co.Bontang, East KalimantanDecember 2004 - August 2005