Arun Field Booster Commpression

The total IKPT fixed lump sum contract price for the onshore and offshore procurement services value US $ 31 mm.
Project Description
The Arun Field Booster Compression project includes the design and installation installation of gathering, separation, dehydration and compression facilities at the Arun Field, Aceh Province Indonesia. Two trains of separation and dehydration equipment were installed at each of the four clusters(I,II,III and IV) and gas compression equipment was centralized at clusters II and IV.
Profile Project

The Arun Field Booster Compression project includes the design and installation installation of gathering, separation, dehydration and compression facilities at the Arun Field, Aceh Province Indonesia. Two trains of separation and dehydration equipment were installed at each of the four clusters(I,II,III and IV) and gas compression equipment was centralized at clusters II and IV.
Profile Project

Client : Mobil Oil Indonesia Inc.

Value : US$ 353 MM

Main Contractor : PT. TPE

Schedule : 1993 - 1994

Location : Lhoksukon, Aceh

Capacity : 900 MMSCFD

Scope of Services

IKPT's as subcontractor to PT. PTE and TEC for procurement services of the project. With a fixed lump sum price contract IKPT is responsible for the process equipment supply scope of the work, including:

On-shore/local procurement of 16 heat exchangers, 34 pressure vessels, and 70 tons of ladders & platforms. Offshore/local procurement of 20 unit air cooled heat exchangers, 2 unit fuel heaters and 6 unit fuel gas filter separators. Inland & sea transportation for local supply equipment.