Project Description
To increase the Ethylene Production of existing Ethylene Plant in Cilegon by mean to install one (1) Ethylene Furnace/Crack Heater with capacity 150,000 tpa beside the existing Furnace and the execution of the work should not shut off the current existing plant operation. The new Furnace will be operated with stand alone (Independent operation philosophy). The existing design of Furnace was based on The Lumus Technology and additional Furnace is open to adopt other Technology such as KBR Technology as long as it can meet with Owner criteria and site condition.

Profile Project
Owner : PT. Chandra Asri
Project Location : Chandra Asri Petrochemical Center (CAPC)
Cilegon, Banten
Project Schedule : Contact Award
Effective Date
EPC Duration
: 20 October 2005
: 01 September 2005
: 22 months
Contract Type : EPC Fixed Lump Sum Price.
Scope of work : Engineering, Procurement and Construction and commissioning of the one (1) Ethylene Furnace in existing CAPC Plant.
Technology : CAPC utilize the KBR's Technology of Furnace.
Facility to be built : Installing one (1) new ethylene furnace and its associate equipment beside the Existing Furnace in CAPC Plant.