Project
Description
To
increase the Ethylene Production of
existing Ethylene Plant in Cilegon by
mean to install one (1) Ethylene
Furnace/Crack Heater with capacity
150,000 tpa beside the existing Furnace
and the execution of the work should not
shut off the current existing plant
operation. The new Furnace will be
operated with stand alone (Independent
operation philosophy). The existing
design of Furnace was based on The Lumus
Technology and additional Furnace is
open to adopt other Technology such as
KBR Technology as long as it can meet
with Owner criteria and site condition.
Profile Project
|
Owner |
: |
PT. Chandra
Asri |
|
Project
Location |
: |
Chandra
Asri Petrochemical Center (CAPC)
Cilegon, Banten |
|
Project
Schedule |
: |
Contact
Award
Effective Date
EPC Duration |
: 20
October 2005
: 01 September 2005
: 22 months |
|
Contract
Type |
: |
EPC Fixed Lump Sum Price. |
|
Scope of
work |
: |
Engineering, Procurement and
Construction and commissioning
of the one (1) Ethylene Furnace
in existing CAPC Plant. |
|
Technology |
: |
CAPC
utilize the KBR's Technology of
Furnace. |
|
Facility to
be built |
: |
Installing
one (1) new ethylene furnace and
its associate equipment beside
the Existing Furnace in CAPC
Plant. |