Project Description
Detail Engineering, Procurement and
Construction for the Betara Gas Plant,
Gas Recovery Facilities, Infrastructure
Betara Gas Plant: Amine Unit and
Incineration, Gas Compression, Gas
Re-injection, Membrane and
Pre-Treatment, NGL Recovery, Power
Generation and Distribution, Process
Building and Shelter, Product Storage,
Sales and Gas Metering and Tie-in to PGN
line, Utilities, Water Disposal, Gas
Recovery System
Infrastructure: Administration,
Maintenance and Safety Facilities,
Construction Camp, Permanent Camp, Road
Scada & Integrated Control System,
Telecommunication.
Main Equipment: Boiler & HRSG, Nitrogen
Generator, Flare, Water Treatment, WWT,
Combustion Turbine Generator (CTG) & EDG,
Fuel Gas Booster Compressor, Pumps, Heat
Exchanger, Air Cooler, Pressure Vessel,
Switchgear, Transformer, UPS, DCS, etc.
Profile Project
|
Client |
: |
Petrochina International (PCI)
Jabung Ltd. |
|
Schedule |
: |
27 months (May'03 - Dec'05) |
|
Value |
: |
UD $ 315 million |
|
Plant Site |
: |
Jabung, Jambi, Sumatra |
|
Contractor |
: |
Is the nominated s/c of Chiyoda
- IKPT |
|
Capacity |
: |
100 MMSCFD of Sales Gas,
22,200 BPD of LPG and
27,000 BOD of Condensate |
|
Scope of Work |
: |
EPC & Commissioning |