LNG Train-H
project was the eighth LNG train
expansion project in Bontang,
which increases the LNG production
capacity. IKPT was responsible for the
entire scope of work until final
acceptance by the client.
Similarly to the previous Train-F
Bontang, IKPT had also successfully
reached the Mechanical Completion for
Train H project on 24th of October, 1999
that 1 (one) month ahead of the
contractual schedule.The utilization of
available local resources 0.85 % greater
than the contractual obligation, follow
:
Profile Project
|
Client |
: |
PT. PERTAMINA |
|
Main Contractor |
: |
PT. IKPT |
|
Duration |
: |
March'97 - Nov'99 |
|
Plant Site |
: |
Bontang, East Kalimantan |
|
Capacity |
: |
2.95 mm TPA of LNG |